Capacite Infraprojects Recruitment 2026 | Civil & High-Rise Jobs

🏢 Capacite Infraprojects Ltd – High-Rise Hiring 2026

Residential & Commercial Tower Construction | Metro Projects

About the Company

Capacite Infraprojects Ltd is a leading Indian construction company specializing in high-rise residential and commercial building projects. The company executes technically complex RCC structures using fast-track slab cycle construction methods. Projects span across Mumbai, Pune, Delhi NCR, Hyderabad, and Bengaluru.

Current Job Openings

Site Engineer – Civil (High-Rise)
Project Engineer – RCC Structures
Planning Engineer – Building Projects
QA/QC Engineer – Civil
Billing Engineer
Finishing Engineer
Safety Officer – Construction Site

Job Locations

Mumbai | Pune | Delhi NCR | Hyderabad | Bengaluru (Project-based transfer policy applicable)

Qualification & Experience

  • Diploma / B.E / B.Tech – Civil Engineering
  • Primavera / MS Project (Planning role preferred)
  • Safety certification (Safety Officer preferred)
  • Experience in slab cycle management & tower construction

Key Skills

  • RCC supervision & reinforcement inspection
  • High-rise slab cycle planning
  • Concrete pouring & curing monitoring
  • BOQ & quantity estimation
  • AutoCAD interpretation
  • MEP coordination
  • DPR preparation
  • Billing documentation & cube testing
  • Knowledge of IS codes & safety norms

Roles & Responsibilities

Site Engineer – Civil

  • Supervise RCC activities
  • Ensure alignment & vertical accuracy
  • Monitor subcontractors
  • Coordinate inspections

Project Engineer

  • Manage overall execution
  • Monitor milestones
  • Handle multiple work fronts

Planning Engineer

  • Prepare baseline schedule
  • Track progress vs target
  • Prepare MIS reports

QA/QC Engineer

  • Conduct cube & material tests
  • Verify reinforcement spacing
  • Maintain documentation

Billing Engineer

  • Prepare RA bills
  • Measure executed quantities
  • Track variations

Finishing Engineer

  • Supervise plaster, tiling & painting
  • Monitor finishing quality

Safety Officer

  • Conduct toolbox talks
  • Ensure PPE compliance
  • Maintain accident-free site

Salary Package (Approx.)

Diploma: ₹3 – ₹5 LPA
Graduate: ₹4 – ₹10 LPA
Senior Engineers: ₹8 – ₹18 LPA

✔ Site Allowance | ✔ Medical Coverage | ✔ Performance Incentives | ✔ Career Growth

Why Join Capacite?

  • Exposure to metro high-rise projects
  • Strong RCC & slab cycle experience
  • Work with reputed developers
  • Structured career growth
  • Hands-on site leadership exposure
📩 Apply via Official Career Portal or Direct Resume Submission

Email Subject: career@capacite.in Application for [Job Title] – [Preferred Location]

Ensure CV mentions total experience, project type handled, slab area handled, current CTC & notice period.

🏗 High-Rise Construction – Interview Q & A

Click on each question to view the answer

Core High-Rise Execution Questions
1️⃣ How do you manage slab cycle time in a high-rise project?
Slab cycle time depends on planning, manpower, and coordination. I check shuttering availability, reinforcement readiness, and MEP sleeve clearance before fixing casting date. Daily monitoring of bar bending, formwork fixing, and material supply helps avoid delay. Floor-wise activity chart keeps cycle consistent.
2️⃣ What checks do you perform before concrete casting?
Verify reinforcement spacing, lap length, cover blocks, embedments, sleeve positions, and shuttering alignment. Confirm cube mould availability and slump test arrangement. After consultant approval, casting begins.
3️⃣ How do you control honeycombing?
Ensure proper vibration, seal shuttering joints, maintain proper workability, and avoid dropping concrete from excessive height.
4️⃣ How do you coordinate with MEP teams?
Review MEP drawings before reinforcement. Finalize sleeve positions early. Conduct coordination meetings to avoid rework.
5️⃣ How do you check reinforcement accuracy?
Cross-check BBS with drawings. Verify diameter, spacing, anchorage, lap location. Random inspection during tying prevents deviation.
6️⃣ What if verticality deviation is found?
Measure with total station. If within tolerance, adjust next lift. If beyond limit, consult structural engineer before proceeding.
7️⃣ How do you ensure finishing quality?
Check plaster thickness, tile alignment, leveling. Execute mock-up before full-scale work.
8️⃣ How do you monitor subcontractor productivity?
Set daily targets. Review output daily. Identify manpower, material, or skill issues and communicate clearly.
9️⃣ Experience with formwork systems?
Use aluminum/system formwork. Ensure alignment, cleaning, oiling, and bolt tightening before reuse.
🔟 Handling tight deadlines?
Prioritize critical tasks, break into smaller targets, increase supervision during casting and critical operations.
Technical & Practical Scenario Questions
1️⃣1️⃣ What if concrete strength test fails?
Verify curing and testing procedure. Conduct core test if needed. Strengthening measures decided based on consultant review.
1️⃣2️⃣ How do you maintain material control?
Track daily consumption, ensure proper storage, reconcile with BBS/BOQ, monitor cement per cubic meter.
1️⃣3️⃣ How do you reduce rework?
Clear drawing study, checklist system, pre-pour & pre-finish inspection reduce rework.
1️⃣4️⃣ How do you ensure safe scaffolding?
Ensure leveling, proper tying, guard rails, safety nets. Mandatory harness usage at height.
1️⃣5️⃣ Why high-rise construction?
High-rise projects improve coordination, structural knowledge, and finishing quality experience — helping faster career growth.

Leave a Reply

Your email address will not be published. Required fields are marked *